Residential · 2025
212 Renovations Group renovated the master suite at 193 Carlton Avenue in Brooklyn — bedroom, en suite bathroom and walk-in closet — in collaboration with Future Projects Architecture.

About twenty weeks across the master suite — bedroom, bathroom and walk-in closet. The bathroom sets the pace: waterproofing, stone, plumbing and millwork stack into one room, each waiting on the one before it.
Millwork · Rift white oak
With · Future Projects Architecture





